Automation validation & OT security

Validate automation before it reaches the plant floor.

We test PLC logic, safety interlocks and industrial networks in high-fidelity digital twins, and harden control systems against the attacks now targeting US infrastructure, so failures and intrusions surface in simulation, not in production.

10+years in safety-critical automation
ISA84active in the ISA84 standards committee
IEC 62443OT security engineered to the IEC 62443 standard
AI-readyindependent validation for AI-assisted PLC code
Validation

Automation Risk Mapping & Operational Resilience

The ARMOR method: five layers that make functional safety and simulation part of the architecture, not an afterthought.

01 · Map

Hazard & risk mapping

Classify safety-critical processes against OSHA PSM, Machine Guarding and FDA 21 CFR 117.

02 · Design

Functional safety design

Architectures built to IEC 61508 and ISA 84 / IEC 61511 to prevent, detect and mitigate failures.

03 · Simulate

Virtual validation

Digital twins stress-test logic, interlocks and networks before commissioning.

04 · Comply

Audit readiness

Controls that flag unauthorized changes and integrity deviations, aligned with 21 CFR Part 11.

05 · Monitor

Risk monitoring

Ongoing review of performance and risk indicators as systems evolve, including the AI that helps build them.

OT Security

Your PLCs are a target. We know how they’re attacked.

Federal alerts warn of coordinated attacks on internet-exposed PLCs in US water systems: passwords changed, operators locked out, processes disrupted. Our engineers hold OT cybersecurity certifications and train continuously, keeping pace with evolving industrial security standards and the latest threat advisories.

Threat brief

What attackers look for

  • PLCs and HMIs exposed to the public internet
  • Default or shared passwords
  • Flat networks between IT and OT
  • Undocumented remote access, like cellular modems
01 · Assess

Exposure assessment

Find every PLC, HMI and remote path reachable from outside before an attacker does.

02 · Harden

Hardening & segmentation

Credentials, firmware, allow-lists and network zones built to IEC 62443 practice.

03 · Prove

Attack simulation

We replay real attack paths against the digital twin to prove the plant fails safe.

Continuously trained on OT security standardsSiemens · Rockwell · Schneider
Industries

Specialists where failure is not an option

Water & wastewater

Treatment and distribution systems where one compromised PLC can stop safe drinking water. We secure and validate the control layer end to end.

  • Internet exposure removed from PLCs and SCADA
  • Setpoint and logic changes validated before they go live
  • Remote sites and telemetry secured
CISA guidanceIEC 62443
SCADA
telemetry and remote sites secured
0
PLCs left exposed online
IEC 62443
OT security practice
ISA 84
safety instrumented functions
Pharmaceutical01 / 04
Featured · Chemical · industrial furnaces

Two thousand degrees of process. Zero guesswork in control.

Scroll to open the furnace and see where RHJ automation does its work.Swipe through the furnace and see where RHJ automation does its work.

Pharmaceutical & food · FDA compliance

Validated by design. Ready for FDA inspection.

In regulated plants, every control-system change is a compliance event. We build and validate the controls behind your electronic records and preventive controls, and keep the evidence audit-ready.

Audit trail · Line 2

Every change signed and traceable

  • 08:14:02Setpoint TIC-101 · 72.0 → 74.0 °FEng-02 · 08:14:02signed
  • 08:14:40Change CR-2291 reviewed and approvedQA-Lead · 08:14:40signed
  • 08:21:15Batch 24-118 startedOperator-07 · 08:21:15signed
  • 08:22:03Unauthorized write blocked · PLC-3System · 08:22:03flagged
  • 08:30:00Record locked · checksum verifiedSystem · 08:30:00locked
Part 11
Compliant
E-signatures
100%
Open deviations
1
21 CFR Part 11

Electronic records & signatures

Audit trails, access control and e-signatures on SCADA, HMI and batch systems, with real-time detection of unauthorized changes.

21 CFR Part 117

Preventive controls, automated

Process controls and monitoring that support FDA food CGMP and preventive controls, with records your quality team can trust.

21 CFR Part 1121 CFR Part 117
Safety & Compliance

Safety commissioning built on federal mandates and international standards

We connect what federal rules require with how technical standards say to do it: OSHA and FDA mandates, engineered and evidenced to ISA 84 / IEC 61511 and IEC 61508.

OSHA PSM + Machine Guarding × ISA 84 / IEC 61511 in one framework. Verifiable. Audit-ready.

SIL
determination and verification
LOPA
layer of protection analysis
FTA
fault tree analysis
Audit-ready
technical files for FDA and OSHA inspections
29 CFR 1910.119

OSHA Process Safety Management

Federal requirements for managing highly hazardous chemical processes.

29 CFR 1910.212

OSHA Machine Guarding

Safeguarding requirements for machinery and moving parts.

IEC 61508

Functional Safety

Safety of electrical, electronic and programmable safety-related systems.

ISA 84 / IEC 61511

Safety Instrumented Systems

Functional safety lifecycle for the process industry.

Control engineering · Siemens TIA Portal · Rockwell Studio 5000

Panels and logic designed to fail safe

Redundant CPU
Automatic failover with no process interruption.
Distributed I/O
Input and output modules installed close to the field.
Interlocks
Logic that blocks unsafe operating conditions.
Diagnostics
Status of every module visible on SCADA.
Training

Systemic Technical Expertise & Engineering Readiness

The STEER method. ARMOR secures the system, STEER readies the people who run it: a standard protocol that embeds engineering expertise in your team, so everything we deploy is operated, sustained and audited in-house.

01 · Competency

Integrated competency

Senior engineering expertise transferred to your automation team, architecting fail-safe systems to OSHA standards.

02 · Scenarios

Applied failure scenarios

Real regulatory cases and automation failure modes prepare technicians for high-stakes decisions.

03 · Immersion

Virtual systems immersion

Operators rehearse on the digital twin, a zero-risk simulator, before the plant goes live.

04 · Reliability

Operational reliability

The OSHA and FDA requirements that apply to each task, built into your standard operating procedures.

05 · Mentorship

Peer-to-peer mentorship

Knowledge transfer embedded in every deployment, not sold as a separate service.

How it rolls out after delivery
  1. 01CommissioningStartup and testing with the live process.
  2. 02TrainingHands-on training for operators and maintenance staff.
  3. 03Assisted operationOn-site support through the first weeks.
  4. 04ComplianceDocumentation for regulatory requirements and audits.
Testimonials

What clients and students say

“RHJ’s safety commissioning team closed, in just two weeks, a compliance gap that had been open for months.”
Maintenance Manager
Food & beverage plant
“The courses are straight to the point. I was applying it on the plant floor the same week.”
Automation Technician
STEER training graduate
“Extremely well-prepared technical team, with excellent teaching for beginners.”
Process Engineer
Chemical plant

Find the failure in simulation, not in production.

Talk to an engineer about validating your next commissioning, upgrade or AI-assisted code change.